• PRODUCT NAME: Steel Structure Hospital
  • SERVICE LIFE: More than 50 years
  • DELIVERY TIME: 15-21 days
  • MAIN STEEL FRAME: H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe
  • STEEL GRADE: Q235, Q345B, Q355, S355JR

  • PRODUCT NAME: Steel Structure Hospital
  • SERVICE LIFE: More than 50 years
  • DELIVERY TIME: 15-21 days
  • MAIN STEEL FRAME: H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe
  • STEEL GRADE: Q235, Q345B, Q355, S355JR

PRODUCTS DESCRIPTION

1 Widely used: It can be applied to factories, warehouses, office buildings, gymnasiums, aircraft hangars, etc. It is suitable for both single-story large-span buildings and multi-story or high-rise buildings.
2 Simple construction, short construction period: All components are prefabricated in the factory, and only simple assembly is required on site, thus greatly shortening the construction cycle, a building of 6000 square meters can be basically installed in 40 days.
3 Durable and easy to maintain: The steel structure building designed by general computer can resist harsh weather and only needs simple maintenance.
4 Aesthetic and practical: The steel building has simple and smooth lines and a modern feel. Colored wall panels are available in a variety of colors and other materials can be used for the walls, thus providing more flexibility.
5 Reasonable cost: Steel structure building is light in weight, reducing the cost of foundation, fast in construction, and can be put into operation as soon as possible, and the comprehensive economic benefits are much better than concrete structure building.

How much does it cost to build a Steel Structure Hospital ?

How much does it cost to build a Steel Structure Hospital ?

Raw materials

Raw materials are a major factor in the cost of steel warehouse construction.

Steel and plates are the main components of steel buildings, accounting for approximately 70%-80% of the total construction cost. Therefore, fluctuations in the market price of steel raw materials directly affect the cost of steel warehouse construction.

In addition, the prices of different steel profiles and supporting surfaces, as well as the material and thickness of the enclosure panels, also vary significantly.

Geological conditions

The cost of the foundation is closely related to the geological conditions of the steel structure building.

When designing a steel building, attention should be paid to the geological report of the location of the steel building to select a reasonable basic type.

Controlling the loading surface and depth of the foundation has a positive effect on the total cost of construction.

Height and Span

Height and span are also important factors in the cost of a steel building. In addition, if your prefabricated steel building is considering the installation of a bridge crane, the price will also vary.

In short, the exact cost depends on the use of your prefabricated steel building and the height-to-span ratio.

Complexity of the structure

The complexity of the structure also affects the construction cost of steel buildings in China.

The more complex the structure, the higher the requirements for design solutions and technology, and therefore, the higher the construction cost of industrial steel buildings.

OUR ADVANTAGES

OUR ADVANTAGES

1.Provide you the building design drawing for free.
2.Fast and flexible installation,safe,heat insulating,sound insulating,water proof,fire proof.
3.High price-performance ratio:convenient installation greatly reduce the project duration and the cost.
4.Durable:easy project maintenance,can be used more than 50 years.
5.Perfect design:the perfect design completely avoid the seepage and leakage while complying with the national fire proof level.
6.Bearing capacity:can resist the strong wind and earth quake impact and bear the big snow load.

By using the AutoCAD,PKPM,MTS,3D3S,Tarch,Revit,Tekla structure,(Xsteel) and other software,we can design complicated industrial workplant,logistic storage,fowls house,shops and market,star hotel,office building,dormitory for school,stadium,high speed railway station,air port and so on.

1.Provide you the building design drawing for free.
2.Fast and flexible installation,safe,heat insulating,sound insulating,water proof,fire proof.
3.High price-performance ratio:convenient installation greatly reduce the project duration and the cost.
4.Durable:easy project maintenance,can be used more than 50 years.
5.Perfect design:the perfect design completely avoid the seepage and leakage while complying with the national fire proof level.
6.Bearing capacity:can resist the strong wind and earth quake impact and bear the big snow load.

By using the AutoCAD,PKPM,MTS,3D3S,Tarch,Revit,Tekla structure,(Xsteel) and other software,we can design complicated industrial workplant,logistic storage,fowls house,shops and market,star hotel,office building,dormitory for school,stadium,high speed railway station,air port and so on.

ABOUT US

ABOUT US

Luoyang Trond Steel Structure Engineering Co., Ltd. is a high-tech enterprise integrating R&D, design, production and sales of steel structures. Located in Yichuan Sandian Industrial Park, Luoyang City.

Our main products are: steel structure warehouse, steel structure workshop, Refrigerated storage, purification workshop, steel structure greenhouse, high-rise steel structure building, steel structure farm, 4S shop, etc. We provide one-stop services from design, production, transportation, installation guidance, etc. to meet the needs of customers and the market.

Luoyang Trond Steel Structure Engineering Co., Ltd. is a high-tech enterprise integrating R&D, design, production and sales of steel structures. Located in Yichuan Sandian Industrial Park, Luoyang City.

Our main products are: steel structure warehouse, steel structure workshop, Refrigerated storage, purification workshop, steel structure greenhouse, high-rise steel structure building, steel structure farm, 4S shop, etc. We provide one-stop services from design, production, transportation, installation guidance, etc. to meet the needs of customers and the market.

PACKING & DELIVERY

PACKING & DELIVERY

Shipment
Normal the goods will be shipped by use 40’ open top container and 40’ HQ container. If use 40’HQ, it need to do a steel pallet to pack the goods, then the whole pallet cargo will be pushed into container together, when you unload the goods, you wold pull the whole pallet out of the container. In this case, the ocean freight will be cheaper, but will increase the cost of pallet. Regarding the open top containers, all the goods will be loaded one by one. In this case, the sea freight of 40’OT is higher than 40’HQ, but The steel pallet for 40’HQ need to be charged. You can tell me your prefer.

Shipment
Normal the goods will be shipped by use 40’ open top container and 40’ HQ container. If use 40’HQ, it need to do a steel pallet to pack the goods, then the whole pallet cargo will be pushed into container together, when you unload the goods, you wold pull the whole pallet out of the container. In this case, the ocean freight will be cheaper, but will increase the cost of pallet. Regarding the open top containers, all the goods will be loaded one by one. In this case, the sea freight of 40’OT is higher than 40’HQ, but The steel pallet for 40’HQ need to be charged. You can tell me your prefer.

Inquiry Now

Inquiry Now

Please tell us about your project and our engineers will provide you with a professional quotation solution.

Please tell us about your project and our engineers will provide you with a professional quotation solution.